Special Item Short Delivery Production System "Walter Xpress"
Manufacturing lead time is 3 weeks! It is possible to eliminate unproductive tool changes and simplify the entire machining process.
Our special short lead time production system 'Walter Xpress' allows for the integration of multiple processes into a single tool using custom-designed special tools. This system can reduce non-productive time in machining. Additionally, by integrating processes, the number of tool changes can also be reduced, allowing machines to operate continuously and improving productivity. Furthermore, we achieve extremely short lead times; after order placement and drawing approval, custom specification tools for this product are shipped from our factory within a manufacturing lead time of three weeks. [Features] ■ Integration of multiple processes into a single tool ■ Elimination of non-productive tool changes ■ Simplification of the entire machining process ■ Manufacturing lead time of three weeks *For more details, please refer to the PDF document or feel free to contact us.
- Company:ワルタージャパン
- Price:Other